In the heart of Mayfair, few projects capture the complexity and ambition of modern construction quite like the transformation of 63–65 Piccadilly.
As principal contractor, Brompton Cross Construction (BCC) has been entrusted with delivering a scheme that is as technically demanding as it is culturally significant: the creation of The WestDill Mayfair Hotel London, Colbert Collection, the UK debut of Minor Hotels’ new luxury brand.
This is not simply a refurbishment. It is the careful reimagining of a historic London icon into a world-class hospitality destination.
A Landmark Reimagined
Positioned prominently on Piccadilly at the corner of Albemarle Street, the building, originally designed in the 1920s and formerly home to NatWest, has long been part of Mayfair’s architectural fabric. Today, it is undergoing a profound transformation into a 50-suite ultra-luxury hotel that will open in late 2026 under Minor Hotels’ Colbert Collection.
For BCC, the opportunity lies in balancing two competing priorities: preserving the integrity of a Grade II listed structure while delivering the standards expected of a contemporary five-star hotel. This duality defines every decision on site.

The Vision: Boutique Luxury Meets Cultural Identity
The Colbert Collection is conceived around the idea of connection, bringing together culinary excellence, social interaction, and a strong sense of place.
The WestDill Hotel Mayfair will embody this philosophy through:
50 bespoke guestrooms and suites across six floors
A destination restaurant and bar
Highly curated interiors reflecting both heritage and modern London
But behind the guest experience lies a complex construction story, one that BCC is responsible for delivering with precision.
The BCC Approach: High Performance Heritage
BCC’s scope on the project is extensive. It includes structural alterations, full MEP installation, heritage restoration, and a complete high-end interior fit-out.
Working within a listed building introduces constraints that demand both technical expertise and sensitivity:
1. Structural Intervention in a Historic Fabric
Adapting a former banking hall and office layout into a luxury hospitality environment requires significant structural reconfiguration. This must be achieved without compromising the building’s original character, particularly its classical façade and internal detailing.
2. Integrating Modern Systems Discreetly
A five-star hotel demands cutting-edge mechanical, electrical, and plumbing systems. Integrating these into a heritage structure, without visible disruption, is one of the project’s most intricate challenges.
3. Restoration of Period Features
From stonework to decorative elements, original features are being carefully restored and, where necessary, replicated. The goal is not just preservation, but elevation.
The Investment Breakdown
The total investment, including acquisition and redevelopment costs, is projected to reach £110 million. For this level of expenditure, the hotel will need to position itself among London’s most exclusive stays, competing with the likes of The Ritz, Claridge’s, and The Connaught. The project is expected to attract high-net-worth individuals, business travelers, and affluent tourists seeking privacy and bespoke service in a prime central location.
- Acquisition Cost: £65 million
- Renovation & Construction Cost: £45 million
- Total Investment: £110 million
- Expected Nightly Rate: £1,000+
- Number of Luxury Suites: 50
Logistics in the Heart of Mayfair
Delivering a £100m+ project (combined acquisition and development value) in one of London’s busiest and most prestigious districts presents a unique logistical puzzle.
Key challenges include:
Restricted access and limited laydown space
High pedestrian and vehicular traffic along Piccadilly
Coordination with neighbouring luxury retail and hospitality operators
Strict planning and conservation requirements
BCC’s role extends beyond construction; it becomes one of orchestration, ensuring that materials, labour, and timelines align within a tightly constrained urban environment
.
Collaboration at Every Level
Projects of this nature succeed through collaboration. BCC works closely with:
Ritchie Design Partners (heritage-focused architects)
Conservation officers and planning authorities
Minor Hotels and Royal Group of Companies (client and developer)
This integrated approach ensures that design intent, heritage compliance, and buildability remain aligned throughout the project lifecycle.
Behind the Scenes
Setting a New Benchmark for Boutique Hospitality
With nightly rates expected to exceed £1,000, the finished hotel is targeting the upper echelon of London’s luxury market.
But for BCC, the benchmark is not just the end product, it is the process:
Precision delivery within a constrained site
Seamless integration of old and new
Craftsmanship that meets both conservation and contemporary standards
The result will be a building that feels both timeless and entirely new.
Before the demolition began, the property was a striking reminder of its past as a working bank.
The grand, yet dated, interiors told the story of a bygone era, with high ceilings, marble floors, and an original bank vault.
Beyond Construction: Creating Legacy
At its core, the transformation of 63–65 Piccadilly is about legacy. It is about taking a historic structure and ensuring its relevance for the next century.
For Brompton Cross Construction, this project reflects a broader capability: delivering complex, high-end developments where heritage, design, and engineering intersect.
When The WestDill Mayfair opens its doors in 2026, guests will experience refined luxury in one of London’s most prestigious locations. What they may not see is the intricate construction story behind it, a story defined by precision, collaboration, and respect for the past.
That is where BCC’s work truly lives.